GE H
EALTHCARE
D
IRECTION
2286865, R
EVISION
14
LOGIQ™ 7 S
ERVICE
M
ANUAL
4-8
Section 4-2 - General Procedure
7.) To power up the scanner, tap POWER button momentary, and wait for power up. It will
approximately 45seconds for the scanner to power up.
Stand-by Sequence
NOTICE
Do not press the Power button long time, as it will cause the system to power down.
Figure 4-11 Stand-by Sequence
Press POWER button
Select "Standby"
Check Monitor
OFF
Wait
Check Touch
Panel OFF
Check POWER
button
illuminated
Wait more than 20 seconds
Disconnect Power Cord
Connect to electrical outlet
(Power Cord)
Press POWER button
Wait 5 seconds
Scanner Start up completion
in 45 seconds
Standby may be
failed
Stand-by
Sequence
ON
ON
OFF
OFF or Blinking
(Note 1)
Note1 : BT09 Release with BEP4 Hardware have "Blinking Power Button"
capability to indicate the console in Stand-by condition. For BEP3 and earlier,
Power button must be "OFF" before disconnecting the power cord.
Содержание LOGIQ 7
Страница 2: ......
Страница 9: ... vii GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL ...
Страница 12: ...GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL x ...
Страница 84: ...GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL 3 26 Section 3 5 Installation Paperwork ...
Страница 116: ...GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL 4 32 Section 4 7 Site Log ...
Страница 204: ...GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL 6 42 Section 6 8 Jumper and Dip Switch Setting ...
Страница 392: ...GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL 10 34 Section 10 7 Electrical Safety Tests ...
Страница 393: ......