GE H
EALTHCARE
D
IRECTION
2286865, R
EVISION
14
LOGIQ™ 7 S
ERVICE
M
ANUAL
Section 4-6 - Power Supply
4-29
Section 4-6
Power Supply
4-6-1
Power Supply Test Procedure
There is no need to perform any special tests on the Power Supplies if there does not seem to be a
problem that may be related to the Power Supplies.
Refer to Section 6-2 - LV Unit Adjustments (For BT03 or lower) if you appear to have a problem that
may be related to the Power Supplies.
4-6-2
Power Supply Adjustment
There are no adjustments on the power supplies. The DC Power is self-regulated. If a voltage is outside
the specified range, it means that something is wrong, either with the power supply itself or with a unit
connected to that specific power outlet.
Содержание LOGIQ 7
Страница 2: ......
Страница 9: ... vii GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL ...
Страница 12: ...GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL x ...
Страница 84: ...GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL 3 26 Section 3 5 Installation Paperwork ...
Страница 116: ...GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL 4 32 Section 4 7 Site Log ...
Страница 204: ...GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL 6 42 Section 6 8 Jumper and Dip Switch Setting ...
Страница 392: ...GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL 10 34 Section 10 7 Electrical Safety Tests ...
Страница 393: ......