Tools and Auxiliary Equipment
A2.1
Customer-Supplied Materials and Equipment for Installation
and Commissioning
Customer-supplied materials and equipment are not included in the
order or supplied by the manufacturer. They must be provided at
the site by the customer.
Materials and equipment listed in sections A2.4 to A2.9 may be
purchased from the GE Service Germany.
A2.2
Materials
- Foundation including anchor bolts, nuts, and washers
- Earthing (grounding) conductors including terminals and
fasteners
- Supports / lattice supports conforming to GE Grid GmbH
drawings
- High voltage terminal pads including fasteners
- Gas for filling the breaker
- Squared timbers and boards on which pole columns can rest
before installation.
A2.3
Hoisting and Climbing or Lifting Equipment
- Crane of sufficient lift height and load-carrying capacity
- Slings and lifting tackle of sufficient load-carrying capacity
- Ladders or lifting platforms.
A2.4
Tools, Test Equipment and Auxiliary Equipment
- Gas-filling device with pressure reducing valve and type Dilo DN8
coupling
- SF
6
leak detector
- Multimeter
- Measuring device for determining operating times
- Measuring device for determining contact resistance
- Assembly tools based on our tool recommendations
- Metal brush with stainless steel bristles.
Содержание GL 311 F3/4031 P/VE
Страница 2: ......
Страница 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Страница 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Страница 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Страница 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Страница 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Страница 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Страница 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Страница 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Страница 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...