![background image](http://html1.mh-extra.com/html/ge/gl-311-f3-4031-p-ve/gl-311-f3-4031-p-ve_operating-instructions-manual_4331766023.webp)
I
NSTALLATION
REV7
/REV7
OI 250 (EN)
Checklist for Installation and Commissioning
Please send one completed and signed copy of the checklist to:
GE Grid GmbH, Service Germany, Lilienthalstrasse 150, 34123 Kassel, Germany,
Fax: +49 561 502-2774, e-mail: [email protected]
Place Date Stamp Signature
Circuit Breaker Data
Type & Serial No.:
Customer:
Station:
Commissioning:
No.
Operation to Be Performed
Section
or Value
1
Safety instructions have been carefully read and are under-
stood
2
Safety instructions for SF
6
handling have been carefully read
and are understood
3
Density monitor mounted and electrically connected
4
Pole columns inspected visually
5
SF
6
piping mounted
6
Operating points of density monitor checked
7
SF
6
piping connected to the pole columns
8
SF
6
gas topped up to rated pressure as shown on nameplate
9
SF
6
piping seals checked using SF
6
leak detector
10
Resistance of anti-condensation heater checked [in ohms]
11
Supply and control cables connected
12
Five closing and five opening operations executed by remote
control
13
Running time of charging motor measured
s
14
Contact resistance measured (> 100A DC)
µ
15
Closing time [ms] checked
A ms
B ms
C ms
16
Opening time [ms] checked
A ms
B ms
C ms
17
Manual closing & opening operations checked
18
Anti-pumping system checked
19
Synchronized operation checked
20
Functional lockout checked
21
Count shown on operations counter recorded
22
Testing and measuring equipment removed
Содержание GL 311 F3/4031 P/VE
Страница 2: ......
Страница 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Страница 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Страница 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Страница 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Страница 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Страница 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Страница 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Страница 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Страница 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...