TABLE
OF
CONTENT
REV7
/REV7
OI 250 (EN)
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Handling Sulfur Hexafluoride . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Safety Precautions When Handling SF6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Safety Precautions When Handling Used SF6. . . . . . . . . . . . . . . . . . . . . . . . . .
Components Supplied . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Transport and Storage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Materials and Equipment to Be Provided by Customer . . . . . . . . . . . . . . . . . . .
6.4.1 a Unpacking Pole Column with Composite Insulator . . . . . . . . . . . . . . . . . . . . . .
6.4.1 b Unpacking Pole Column with Porcelain Insulators. . . . . . . . . . . . . . . . . . . . . . .
Mounting the Connecting Brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mounting the Density Monitor and Filler Block to Pole B . . . . . . . . . . . . . . . . . .
Mounting the Mechanism on Pole B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Connecting the Drive Rod to the Drive Lever. . . . . . . . . . . . . . . . . . . . . . . . . . .
Connecting the Operating Mechanisms and Pole Columns. . . . . . . . . . . . . . . .
Aligning the Pole Columns Using a Tire Lever (if required) . . . . . . . . . . . . . . . .
Mounting the High Voltage Terminal Pads. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Earthing (Grounding) the Circuit Breaker . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Содержание GL 311 F3/4031 P/VE
Страница 2: ......
Страница 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Страница 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Страница 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Страница 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Страница 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Страница 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Страница 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Страница 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Страница 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...