![background image](http://html1.mh-extra.com/html/ge/gl-311-f3-4031-p-ve/gl-311-f3-4031-p-ve_operating-instructions-manual_4331766085.webp)
R
ECONDITIONING
REV7
/REV7
OI 250 (EN)
10.1.3
Removing the Guide Shaft
• Remove the socket head cap screw (17) and the locking plate
(18).
• Remove the guide shaft (28) and space sleeve (21) from the fixed
contact.
• The interrupter unit is connected by the guide lever to the
movable contact system. Remove the interrupter unit, the guide
lever and the movable contact system from the fixed contact.
5
Interrupter unit
1x
6
Movable contact system
1x
7
Fixed contact
1x
8
Guide lever
2x
17
Socket head cap screw, M8x12 A-70
1x
18
Locking plate
1x
21
Spacer sleeve
1x
28
Guide shaft
1x
5
7
6
17
8
28
18
21
B
A
-P
-P
S-3
Содержание GL 311 F3/4031 P/VE
Страница 2: ......
Страница 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Страница 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Страница 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Страница 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Страница 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Страница 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Страница 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Страница 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Страница 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...