![background image](http://html1.mh-extra.com/html/ge/gl-311-f3-4031-p-ve/gl-311-f3-4031-p-ve_operating-instructions-manual_4331766101.webp)
R
ECONDITIONING
REV7
/REV7
OI 250 (EN)
Reassembly:
• Replace all O-rings and gaskets.
• Reverse the sequence to assemble the crankcase.
• Insert a new filter bag
(see “Replacing the Adsorption filter”
• Mount the interrupter chamber
Interrupter Chamber to the Post Insulator” on Page 95)
• Remount the pole column on the base frame.
• Re-commission the circuit breaker as described in the
commissioning section.
The following instructions must be followed when assembling
and installing the parts:
- Follow the specified lubrication procedure.
- Replace all seals and gaskets.
- Tighten the three screws (68) to a torque of 18Nm.
- Do not forget the filter sleeve (48).
- Do not install a new filter bag until right before evacuating the
assembled pole column.
CAUTION
Содержание GL 311 F3/4031 P/VE
Страница 2: ......
Страница 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Страница 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Страница 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Страница 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Страница 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Страница 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Страница 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Страница 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Страница 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...