![background image](http://html1.mh-extra.com/html/ge/gl-311-f3-4031-p-ve/gl-311-f3-4031-p-ve_operating-instructions-manual_4331766084.webp)
R
ECONDITIONING
OI 250 (EN)
REV7
/REV7
10.1.2
Removing the Double Motion System
• Remove eight screws (3) and washers (4) from the upper flange
of the chamber insulator (1).
• Carefully remove the double motion system (2).
1
Chamber insulator
1x
2
Double motion system
1x
3
Hexagon screw, M12x45 A2-70
8x
4
Washer, 12x40 A2
8x
2
1
4
3
B
A
-P
-PS
-2
Содержание GL 311 F3/4031 P/VE
Страница 2: ......
Страница 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Страница 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Страница 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Страница 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Страница 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Страница 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Страница 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Страница 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Страница 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...