Commissioning
The five safety rules of electrical engineering must be followed:
- Disconnect the equipment from the power supply.
- Install safeguards to ensure that the power cannot be turned on
again.
- Confirm that the equipment is de-energized.
- Earth (ground) and short-circuit the equipment.
- Cover or provide barriers for adjacent energized equipment.
7.1
Density Monitor
As an option, the circuit breaker may be equipped with a separate
density monitor for each pole. The respective operations must then
be carried out for each pole.
7.1.1
Connecting the Cable
The cable is already connected to the density monitor. The cable
entry gland is located on the rear or underside of the operating
mechanism.
• Insert the cable into the operating mechanism through the cable
gland and connect it according to the schematic diagram.
Serious personal injury or property damage can result during
commissioning if the equipment is live or energized.
Therefore:
- Make sure that the circuit breaker is disconnected from
the high voltage system.
- Make sure the circuit breaker is earthed (grounded).
DANGER
Содержание GL 311 F3/4031 P/VE
Страница 2: ......
Страница 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Страница 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Страница 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Страница 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Страница 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Страница 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Страница 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Страница 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Страница 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...