Checklist for Installation and Commissioning
Circuit Breaker Data
Type & Serial No.:
Customer:
Station:
Installation
No.
Operation to Be Performed
Section
1
Safety instructions have been carefully read and are under-
stood
2
Materials provided by station checked for completeness
3
Shipment checked for completeness and lack of damage
4
Component serial numbers checked for agreement
5
SF
6
shipping pressure in each pole column checked
6
Lattice supports mounted
7
Connecting brackets mounted
8
Density monitor and filler block mounted on lattice supports
9
Mechanisms mounted on lattice supports
10
Pole columns installed
12
Drive rod connected to drive lever
13
Drive rod adjusted to reduce clearance and pole columns
completely tightened
14
Transport lock removed from operating mechanism
15
High voltage terminal pads mounted
16
Lattice supports grounded
Содержание GL 311 F3/4031 P/VE
Страница 2: ......
Страница 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Страница 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Страница 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Страница 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Страница 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Страница 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Страница 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Страница 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Страница 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...