Table of Contents
vi
2.4
Installation of the ACU
.......................................................................2-26
2.4.1 To install the ACU ..............................................................................2-26
2.4.2 To ground the ACU ............................................................................2-27
2.5
Installation of the VMU
......................................................................2-27
2.5.1 General mounting considerations — VMU ........................................2-27
2.6
To install the dual-antenna mode (optional)
....................................2-28
Chapter 3
Interfaces
3.1
Interfaces of the FV-110 ACU
.............................................................3-1
3.1.1 LEDs, display and keypad ....................................................................3-1
3.1.2 ACU connector panel — overview .......................................................3-1
3.1.3 ADU connector .....................................................................................3-2
3.1.4 Rx/Tx connectors for VMU
.............................................................3-2
3.1.5 NMEA 0183 connector .........................................................................3-3
3.1.6 RS-232 and RS-422 connectors ............................................................3-4
3.1.7 LAN1, LAN2, LAN3 and LAN4 connectors .......................................3-5
3.2
Interfaces of the VMU
..........................................................................3-5
Chapter 4
Connecting power
4.1
Power up
................................................................................................4-1
4.1.1 Procedure ..............................................................................................4-1
4.1.2 Initialisation steps in daily use ..............................................................4-2
4.1.3 FV-110 operational ...............................................................................4-2
Chapter 5
Configuration
5.1
Introduction to the built-in web interface
..........................................5-1
5.1.1 Overview ...............................................................................................5-1
5.1.2 Connecting to the web interface ...........................................................5-1
5.2
Calibration
.............................................................................................5-3
5.2.1 Heading mode and position mode ........................................................5-3
5.2.2 Azimuth calibration ..............................................................................5-7
5.2.3 To set up a service profile for calibration .............................................5-9
5.2.4 Cable calibration .................................................................................5-11
5.2.5 Operation in gyro-free mode ...............................................................5-11
5.2.6 Flow chart for calibration (user controlled).........................................5-13
5.2.7 To make a line up procedure ...............................................................5-14
5.2.8 Fixed TX gain principle ......................................................................5-15
Содержание FV-110
Страница 1: ...KU BAND ANTENNA FV 110 OPERATOR S MANUAL www furuno com Model...
Страница 54: ...To install the dual antenna mode optional 2 30 This page is intentionally left blank...
Страница 60: ...Interfaces of the VMU 3 6 This page is intentionally left blank...
Страница 116: ...SNMP support 5 54 This page is intentionally left blank...
Страница 122: ...Installation check list Functional test in harbor 6 6 This page is intentionally left blank...
Страница 142: ...Modem Cable iNFINITI iDirect VSAT modem B 4 This page is intentionally left blank...
Страница 178: ...Linkway S2 modem C 36 This page is intentionally left blank...
Страница 192: ...E 4 This page is intentionally left blank...
Страница 204: ...RF interference F 12 This page is intentionally left blank...
Страница 218: ...OEM declaration H 2 H 2 OEM declaration...
Страница 219: ...CE R TTE H 3 H 3 CE R TTE The FV 110 is CE certified R TTE directive as stated in the EU Declaration of Conformity...
Страница 220: ...Eutelsat S A ESV Summary Sheet H 4 H 4 Eutelsat S A ESV Summary Sheet...
Страница 221: ...Russian Maritime Register of Shipping H 5 H 5 Russian Maritime Register of Shipping...
Страница 222: ...Russian Maritime Register of Shipping H 6...
Страница 223: ...Russian Maritime Register of Shipping H 7...
Страница 229: ...OD 1 15 Feb 2017 H MAKI...
Страница 230: ...OD 2 16 Feb 2017 H MAKI...
Страница 232: ......