Configuration with the web interface
5-17
Dashboard and navigation
The Dashboard is the first screen that is displayed when the user or administrator enters
the IP address of the web interface of the ACU. The Dashboard is used for viewing
properties and status of the ACU and ADU.
The web interface consists of the following sections:
Figure 5-15: Web interface: DASHBOARD of FV-110
1. The navigation pane contains the menus. You can click an item in the menu to open the
list of submenus or a new page in the contents section. The currently displayed menu is
marked by a bullet.
2. The top bar shows the following:
• RX signal strength bars: This shows the tracking signal strength of the antenna. The
signal strength can vary during operation, depending on the current position
relative to the satellite. The signal strength of the VSAT modem is shown on the
DASHBOARD
in the section
MODEM
, at
Signal level
.
• BUC output power bars: This indicates if the BUC is transmitting or not. This is a
unique feature of the SAILOR 900 VSAT High Power antenna. A built-in power
detector in the OMT developed by Cobham SATCOM makes it possible to measure
the power within a time window to be able to catch short TX bursts. The power
within the window is averaged and shown in the BUC output power bar graph on
the DASHBOARD. Not that this indicator is an averaged signal, it is not a real-time
indicator. After measuring a signal burst the bar graph falls slowly in order for the
user to be able to see short TX bursts.
The BUC output power indicator is very useful during installation as the service
engineer knows whether the antenna is transmitting or not and that the hub should
be able to monitor the transmission. It is also very useful when doing line up with
the hub as the service engineer can monitor the TX BUC output power level on the
DASHBOARD and watch when the output power approaches the P1dB
compression point which is at 4 bars.
1
2
3
Содержание FV-110
Страница 1: ...KU BAND ANTENNA FV 110 OPERATOR S MANUAL www furuno com Model...
Страница 54: ...To install the dual antenna mode optional 2 30 This page is intentionally left blank...
Страница 60: ...Interfaces of the VMU 3 6 This page is intentionally left blank...
Страница 116: ...SNMP support 5 54 This page is intentionally left blank...
Страница 122: ...Installation check list Functional test in harbor 6 6 This page is intentionally left blank...
Страница 142: ...Modem Cable iNFINITI iDirect VSAT modem B 4 This page is intentionally left blank...
Страница 178: ...Linkway S2 modem C 36 This page is intentionally left blank...
Страница 192: ...E 4 This page is intentionally left blank...
Страница 204: ...RF interference F 12 This page is intentionally left blank...
Страница 218: ...OEM declaration H 2 H 2 OEM declaration...
Страница 219: ...CE R TTE H 3 H 3 CE R TTE The FV 110 is CE certified R TTE directive as stated in the EU Declaration of Conformity...
Страница 220: ...Eutelsat S A ESV Summary Sheet H 4 H 4 Eutelsat S A ESV Summary Sheet...
Страница 221: ...Russian Maritime Register of Shipping H 5 H 5 Russian Maritime Register of Shipping...
Страница 222: ...Russian Maritime Register of Shipping H 6...
Страница 223: ...Russian Maritime Register of Shipping H 7...
Страница 229: ...OD 1 15 Feb 2017 H MAKI...
Страница 230: ...OD 2 16 Feb 2017 H MAKI...
Страница 232: ......