Installation of the ADU
2-18
2.3
Installation of the ADU
The ADU is shipped fully assembled. You have to install it on the mast and attach the
ADU cable.
Before installing the ADU read the following guidelines.
WARNING!
Use a strong webbed sling with a belt to
lift the ADU without damaging the radome. Make sure
that the sling can carry the ADU’s weight126,5 kg (FV-
110).
WARNING!
The ADU may be subject to swaying
motions in windy conditions. Always use tag lines to
stabilise the ADU during hoisting.
Figure 2-14: FV-110: Use of strong sling with a belt and tag lines for safe
hoisting
Tag lines
Webbed sling with belt
Содержание FV-110
Страница 1: ...KU BAND ANTENNA FV 110 OPERATOR S MANUAL www furuno com Model...
Страница 54: ...To install the dual antenna mode optional 2 30 This page is intentionally left blank...
Страница 60: ...Interfaces of the VMU 3 6 This page is intentionally left blank...
Страница 116: ...SNMP support 5 54 This page is intentionally left blank...
Страница 122: ...Installation check list Functional test in harbor 6 6 This page is intentionally left blank...
Страница 142: ...Modem Cable iNFINITI iDirect VSAT modem B 4 This page is intentionally left blank...
Страница 178: ...Linkway S2 modem C 36 This page is intentionally left blank...
Страница 192: ...E 4 This page is intentionally left blank...
Страница 204: ...RF interference F 12 This page is intentionally left blank...
Страница 218: ...OEM declaration H 2 H 2 OEM declaration...
Страница 219: ...CE R TTE H 3 H 3 CE R TTE The FV 110 is CE certified R TTE directive as stated in the EU Declaration of Conformity...
Страница 220: ...Eutelsat S A ESV Summary Sheet H 4 H 4 Eutelsat S A ESV Summary Sheet...
Страница 221: ...Russian Maritime Register of Shipping H 5 H 5 Russian Maritime Register of Shipping...
Страница 222: ...Russian Maritime Register of Shipping H 6...
Страница 223: ...Russian Maritime Register of Shipping H 7...
Страница 229: ...OD 1 15 Feb 2017 H MAKI...
Страница 230: ...OD 2 16 Feb 2017 H MAKI...
Страница 232: ......