![Furuno FCV-38 Скачать руководство пользователя страница 118](http://html1.mh-extra.com/html/furuno/fcv-38/fcv-38_manual_2349641118.webp)
5. CALIBRATION
5-6
3. Tie the fishing lines of the remaining
two fishing rods to the standard
sphere. Use a "figure-eight" knot to tie
the fishing lines.
Note:
Do not use a joining tool like a
swivel.
4. If the tide speed is high and it is diffi-
cult to tie the standard sphere, attach
a weight below the standard sphere.
Install the weight at least 10 m away
from the sphere.
5. Put seawater and surface-activating
agent into the bucket.
6. Soak the standard sphere in the solu-
tion prepared at step 5 to prevent air
bubbles and dirt from adhering to the
sphere. Avoid touching the sphere as
much as possible.
7. Lower the standard sphere to the bot-
tom of the ship, being careful not to
tangle the fishing line. During the low-
ering, be careful not to apply tension
to the fishing line of the #1 fishing rod. Also, be careful not to rub the fishing line
of the #1 fishing rod against the bottom of the boat.
To fishing rod
(3 pcs)
Fishing
line
Standard
sphere
5 m or
more
10 m or
more
Distance between
sphere and weight
shall be at least 10 m.
Attach weight,
if necessary.
Calibration ball
Be sure the rope does
not get tangled.
Be careful not to rub
fishing line on hull.
Make sure that two
pieces are tensioned
at the same time.