Installation Instructions
Page 50
AGT 6000 PVMV-N 12V_24V - Chapter B: Installation Instructions
B.8 Insulation test
ATTENTION: Once the electrical system installation is complete, a ground
insulation test must be performed as follows:
1.) Switch off all on-board electrical devices.
2.) Start the generator..
3.) Measure the AC-voltage with a voltmeter (adjust to Volt/AC) between:
a) generator housing and AC-Control box
b) generator housing and ground.
The measured voltage must not exeed 50mV (millivolts).
4.) Once the safety systems have been installed, they must be checked. If a leakage current relay
has been installed, it also has to be tested. In order to ensure that the leakage voltage relay
functions properly, the individual generated phases from the generator must be checked between
each other, between phase and ground, (the single phase or 4th phase also needs to be checked
in this fashion).
5.) If the generator is protected by a ground connection, then ALL electrical devices, must also be
connected to this "common" ground (usu. ground contacts are attached to the devices' metallic
housings).
The electrical system installation must also comply to the hook-up requirements of the shore cur-
rent grid. Generally a leakage current relay is sufficient for safe electrical operation, however, this
must be confirmed by the electrical safety standard in the region where the system is attached to
a main land power grid. The relay has to be meet the required safety standard regulations.
02
05
03
06
04
01
01. Connection „Battery (+)“
02. Terminal 7
03. Terminal 8
04. Terminal 9
05. Internal fuse
06. Solder bridge J1
Содержание AGT 6000 PVMV-N
Страница 1: ...Panda AGT 6000 PVMV N Super silent technology 24V 6kW Fischer Panda GmbH ...
Страница 6: ......
Страница 10: ...8 Socket wrench set Hexagon wrench keys ...
Страница 92: ...Generator Failure Page 90 AGT 6000 PVMV N 12V_24V Chapter D Generator Failure ...
Страница 100: ...Appendix Page 98 AGT 6000 PVMV N 12V_24V Chapter E Appendix ...
Страница 102: ...Page 100 AGT 6000 PVMV N 12V_24V Chapter E E 6 Capsule Measurements ...
Страница 106: ...VCS AGT U I Page 104 Chapter A VCS AGT U I VCS AGT UI_eng fm Fischer Panda Datasheet blank ...