
Operation
BOMAG
59
MPH 122-2
4.10 Shutting down engine and
machine
Fig. 93
l
Shift the travel lever (Fig. 93) slowly to position
neutral position.
Fig. 94
l
Turn the rotary switch for the rotor (Fig. 94) to
position "0" (rotor off).
Fig. 95
l
Lower the rotor to the ground by operating the
lever ”rotor up/down” (Fig. 95).
Fig. 96
l
Set the engine speed potentiometer (Fig. 96)
to position “MIN“, (idle speed).
!
Caution
Do not shut down the engine all of a sudden
from full load speed, but let it idle for about 2
minutes.
Содержание Bomag MPH 122-2
Страница 2: ......
Страница 8: ...Table of Contents BOMAG 8 MPH 122 2...
Страница 9: ...BOMAG 9 MPH 122 2 1 Technical Data...
Страница 13: ...BOMAG 13 MPH 122 2 2 Safety regulations...
Страница 24: ...Safety regulations BOMAG 24 MPH 122 2...
Страница 25: ...BOMAG 25 MPH 122 2 3 Indicators and Controls...
Страница 26: ...Indicators and Controls BOMAG 26 MPH 122 2...
Страница 27: ...Indicators and Controls BOMAG 27 MPH 122 2 Fig 9 Fig 10...
Страница 49: ...BOMAG 49 MPH 122 2 4 Operation...
Страница 82: ...Operation BOMAG 82 MPH 122 2...
Страница 83: ...BOMAG 83 MPH 122 2 5 Operation of binder dosing system...
Страница 95: ...BOMAG 95 MPH 122 2 6 Maintenance...
Страница 101: ...Maintenance BOMAG 101 MPH 122 2 Compressor service unit Use only acid free pneumatic oil STASTO HP 32...
Страница 124: ...Every 10 operating hours BOMAG 124 MPH 122 2...
Страница 130: ...Every 50 operating hours BOMAG 130 MPH 122 2...
Страница 172: ...Every 4000 operating hours BOMAG 172 MPH 122 2...
Страница 189: ...BOMAG 189 MPH 122 2 7 Trouble shooting...
Страница 197: ......
Страница 198: ......