
Operation
BOMAG
55
MPH 122-2
Fig. 81
l
Turn the rotary switch for the rotor (Fig. 81) to
position "0" (rotor off).
Fig. 82
l
Raise the rotor with the lever for ”rotor up/
down” (Fig. 82) to such a height, that the ma-
chine is safe to drive.
Fig. 83
The height shut-down control light (h) (Fig. 83) in
the instrument cluster for machine functions lights
up.
Fig. 84
l
Turn the rotary speed range selector switch
(Fig. 84) to the "right" (transport stage II).
Fig. 85
l
Turn the rotary parking brake switch (Fig. 85)
to position "left" (parking brake released).
Содержание Bomag MPH 122-2
Страница 2: ......
Страница 8: ...Table of Contents BOMAG 8 MPH 122 2...
Страница 9: ...BOMAG 9 MPH 122 2 1 Technical Data...
Страница 13: ...BOMAG 13 MPH 122 2 2 Safety regulations...
Страница 24: ...Safety regulations BOMAG 24 MPH 122 2...
Страница 25: ...BOMAG 25 MPH 122 2 3 Indicators and Controls...
Страница 26: ...Indicators and Controls BOMAG 26 MPH 122 2...
Страница 27: ...Indicators and Controls BOMAG 27 MPH 122 2 Fig 9 Fig 10...
Страница 49: ...BOMAG 49 MPH 122 2 4 Operation...
Страница 82: ...Operation BOMAG 82 MPH 122 2...
Страница 83: ...BOMAG 83 MPH 122 2 5 Operation of binder dosing system...
Страница 95: ...BOMAG 95 MPH 122 2 6 Maintenance...
Страница 101: ...Maintenance BOMAG 101 MPH 122 2 Compressor service unit Use only acid free pneumatic oil STASTO HP 32...
Страница 124: ...Every 10 operating hours BOMAG 124 MPH 122 2...
Страница 130: ...Every 50 operating hours BOMAG 130 MPH 122 2...
Страница 172: ...Every 4000 operating hours BOMAG 172 MPH 122 2...
Страница 189: ...BOMAG 189 MPH 122 2 7 Trouble shooting...
Страница 197: ......
Страница 198: ......