
Every 500 operating hours
BOMAG
145
MPH 122-2
Fig. 284
l
Turn the rotary switch for parking brake (Fig.
284) to the "right" (parking brake applied).
Fig. 285
l
Lift the rotor with the lever for "rotor up/down"
(Fig. 285), until the rotor hood is in highest po-
sition.
Fig. 286
l
Hook the safety chains (Fig. 286) by the two
large chain links into the hooks on the rotor
hood.
Fig. 287
l
Lower the rotor to just above the ground by op-
erating the lever ”rotor up/down” (Fig. 287).
Fig. 288
l
Press the tailgate lever (Fig. 288) to the left,
until the tailgate is completely open.
!
Danger
Danger of accident!
Always secure the hood gate with the bolt
when working on the rotor.
Содержание Bomag MPH 122-2
Страница 2: ......
Страница 8: ...Table of Contents BOMAG 8 MPH 122 2...
Страница 9: ...BOMAG 9 MPH 122 2 1 Technical Data...
Страница 13: ...BOMAG 13 MPH 122 2 2 Safety regulations...
Страница 24: ...Safety regulations BOMAG 24 MPH 122 2...
Страница 25: ...BOMAG 25 MPH 122 2 3 Indicators and Controls...
Страница 26: ...Indicators and Controls BOMAG 26 MPH 122 2...
Страница 27: ...Indicators and Controls BOMAG 27 MPH 122 2 Fig 9 Fig 10...
Страница 49: ...BOMAG 49 MPH 122 2 4 Operation...
Страница 82: ...Operation BOMAG 82 MPH 122 2...
Страница 83: ...BOMAG 83 MPH 122 2 5 Operation of binder dosing system...
Страница 95: ...BOMAG 95 MPH 122 2 6 Maintenance...
Страница 101: ...Maintenance BOMAG 101 MPH 122 2 Compressor service unit Use only acid free pneumatic oil STASTO HP 32...
Страница 124: ...Every 10 operating hours BOMAG 124 MPH 122 2...
Страница 130: ...Every 50 operating hours BOMAG 130 MPH 122 2...
Страница 172: ...Every 4000 operating hours BOMAG 172 MPH 122 2...
Страница 189: ...BOMAG 189 MPH 122 2 7 Trouble shooting...
Страница 197: ......
Страница 198: ......