EDA 2530 Commissioning Procedure for Cable and Wireless Access
1/153 22-FGC 101 0239/2 Uen Rev J 2010-04-01
©
Ericsson AB 2010
Commercial in confidence
4 (200)
4.5.1
Labelling.................................................................................................45
5
Initial Configuration .............................................................................47
5.1
IP Address Configuration Of PC Used As LCT ......................................47
5.2
Common Part Card CF Download..........................................................50
5.3
Subrack Equipping .................................................................................53
5.4
Logon to The EDA 2530 Via LCT...........................................................54
5.5
Reset The Backplane EPROM...............................................................55
5.6
Software Inventory Check ......................................................................57
6
Software Download/Upgrade ..............................................................61
7
Configure IP and Ethernet Management ............................................67
7.1
Configure The Optical SFP Modules Gigabit Ethernet...........................69
7.2
Configure CP Ethernet Interfaces ..........................................................72
7.2.1
Configure CP Port 1 ...............................................................................72
7.2.2
Configure CP Port 2 ...............................................................................73
7.2.3
Configure CP Port 3 (If required)............................................................73
7.2.4
Configure CP Port 4 (If required)............................................................73
7.3
Configure EDA 2530 Tag Protocol ID/Bridging Parameters...................74
7.4
ADSL Card Configuration Files ..............................................................75
7.5
SHDSL Card Configuration Files............................................................75
7.6
Configure Static VLANs..........................................................................76
7.7
Adding Interfaces to the Static VLANs ...................................................79
7.7.1
Create S-VLANs for Additional ADSL Cards (If required) ......................81
7.7.2
Create S-VLANs for SHDSL Cards (If required) ....................................83
7.7.3
Create S-VLANs for POTS Cards (If required).......................................85
7.7.4
Complete VLAN Creation.......................................................................88
7.7.5
Create S-VLANs on the “Parent” to Subtend Child#2 (If required).........88
7.7.6
Create S-VLANs on the “Parent” to Subtend Child#3 (If required).........94
7.8
Configuring The IBM Sub-Interface........................................................96
7.9
Assign The IBM IP Address ...................................................................98
7.10
Configure The Default Gateway ...........................................................100
7.11
xDSL Bridge Management - Configure xDSL Bridge ...........................101
7.12
xDSL Bridge Management - Configure PVC ........................................104
7.12.1
Download xDSL PVC Management File ..............................................104
7.12.2
Check PVC Management PPPoA Payload & MRU Settings................105
7.12.3
Configure PVC Management ...............................................................106
7.12.4
Configure Additional xDSL Cards.........................................................111
7.13
xDSL Bridge Management – Downstream Flow Assignment...............112
7.14
Configure ADSL Profiles ......................................................................114
7.15
Configure SHDSL Line Profiles ............................................................116
7.16
Configure SHDSL Stack Profiles..........................................................118
7.17
Configure POTS Card(s) ......................................................................121
7.17.1
POTS Card Configuration Files............................................................121
7.17.2
Step 1: LCT 07.02.05 – Known Issue with Java Version 1.6 ...............121
7.17.3
Step 2: Add POTS Card(s) Interfaces to Static VLANs........................121
7.17.4
Step 3: Configure UK National Mapping ..............................................122
7.17.5
Step 4: Configure ITAM For Double Play .............................................124
7.17.6
Step 5: Configure RTP Profiles ............................................................126
7.17.7
Step 6: Check TOIP Profiles ................................................................130
7.17.8
Step 7: Configure POTS Cards ............................................................131