EDA 2530 Commissioning Procedure for Cable and Wireless Access
1/153 22-FGC 101 0239/2 Uen Rev J 2010-04-01
©
Ericsson AB 2010
Commercial in confidence
140 (200)
r.
Now Select the “
MGCs
” tab.
s.
The Primary Media Gateway Controller “
Domain Name
” field will contain
“iMSS-BULLDOG-01” for all gateway entries. (In the future, different UK
regions may have different Domain Names.)
t.
The Primary Media Gateway Controller “
IP Address
” field must be filled in
with the MGWC IP Address (Media Gateway Controller) for the site. Refer
to the “MGWC IP Address” column on the “CWA Voice Card Deployment”
spreadsheet for the site being commissioned.
IMPORTANT:
Be very careful as the same “MGWC IP Address” is used for
more than one site but is NOT the same for all sites. (Eg For Edmonton use
83.146.63.27).
u. The
“
EDA 4.11 Only
” tab remains the same for all sites and does not
change.
v.
Repeat the above steps L. to U for all other POTS cards.
w.
Select the “
App. Control
” tab.
x.
Each POTS card has a row assigned to it, under the “
Command
” column
for each row set each entry to “
create
”, ie if there is only one POTS cards
installed then only set row 1 to “create”.
Blank