Proline Promag 51
6 Commissioning
Hauser
75
6.2
Function check
Make sure that all final checks have been completed before you start up your measuring point:
• Checklist for “Installation check”
→
• Checklist for “Electrical connection check”
→
6.3
Switching on the measuring device
Once the connection checks (see Page 51) have been successfully completed, it is time
to switch on the power supply. The device is now operational.
The measuring device performs a number of post switch-on self-tests. As this procedure
progresses the following sequence of messages appears on the local display:
Normal measuring mode commences as soon as start-up completes. Various measured-value
and/or status variables (HOME position) appear on the display.
!
Note!
If start-up fails, an error message indicating the cause is displayed.
PROMAG 51
START UP ...
Start-up message
▼
DEVICE SOFTWARE
V XX.XX.XX
Current software version (example)
▼
CUSTODY TRANSFER
NO / YES
Status display of the custody transfer mode
▼
SYSTEM OK
→
OPERATION
Beginning of normal measuring mode
▼
Содержание Proline Promag 51
Страница 4: ...QUICK SETUP commissioning Proline Promag 51 4 Endress Hauser...
Страница 10: ...1 Safety instructions Proline Promag 51 10 Endress Hauser...
Страница 52: ...4 Wiring Proline Promag 51 52 Endress Hauser...
Страница 80: ...7 Maintenance Proline Promag 51 80 Endress Hauser...
Страница 104: ...9 Trouble shooting Proline Promag 51 104 Endress Hauser...
Страница 122: ...11 Index Proline Promag 51 122 Endress Hauser...
Страница 124: ...www endress com worldwide BA080D 06 en 03 05 50101924 FM SGML6 0...