10.1.2.
Standard test Routine
Page 2
Standard test routines
With the selection of F1 ....F6 the test is conducted
automatically with the parameters and the test sequence
as required per IEC 61000-4-5. The only parameters the
operator is able to change are the repetition rate and the
number of pulses per test level. With a faster repetition
rate as required in the standard the total testing time can
be reduced significantly.
F1 : IEC 61000-4-5
Level 1
500V
F2 : IEC 61000-4-5
Level 2
1000V
F3 : IEC 61000-4-5
Level 3
2000V
F4 : IEC 61000-4-5
Level 4
4000V
F5 : EN 61000-6-1
Generic
2000V
F6 : EN 61000-6-2
Generic
2000V
F7 : Manual test routine
F1
F2
F3
F4
F5
F6
F7
Tests with the function keys F1…F4 use the given testlevel with all couplings (common- and differential mode).
Iteration of the standard test procedure as per IEC 61000-4-5
The surges have to be applied
synchronized to the voltage phase at
the respective angle and the peak
value of the a.c. voltage wave (positive
and negative).
The surges have to be applied line to
line and line(s) and earth. When
testing line to earth the test voltage
has to be applied successively
between each of the lines and earth.
The test voltage has to be increased
by steps from the lowest test level up
to the test level specified in the product
standard or test plan.
List of settings EN 61000-6-1
( each setting with 5 pulses )
Setting Voltage
Coupling
Polarity
Phase angle
Setting Voltage
Coupling
Polarity
Phase angle
1
2
3
4
500
L-N
pos
0
90
180
270
33
34
35
36
1000
L-PE
pos
0
90
180
270
5
6
7
8
neg
0
90
180
270
37
38
39
40
neg
0
90
180
270
9
10
11
12
L-PE
pos
0
90
180
270
41
42
43
44
N-PE
pos
0
90
180
270
13
14
15
16
neg
0
90
180
270
45
46
47
48
neg
0
90
180
270
17
18
19
20
N-PE
pos
0
90
180
270
49
50
51
52
2000
L-PE
pos
0
90
180
270
21
22
23
24
neg
0
90
180
270
53
53
55
56
neg
0
90
180
270
25
26
27
28
1000
L-N
pos
0
90
180
270
57
58
59
60
N-PE
pos
0
90
180
270
29
30
31
32
neg
0
90
180
270
57
58
59
60
neg
0
90
180
270