INSTALLING OPTIONS AND ACCESSORIES
Power Xpert
9395 UPS (450–550 kVA) Installation and Operation Manual
164201701 Rev 3
www.eaton.com/powerquality
5-9
NOTE
When installing signal wiring for CAN card J3 terminals, conduit must be installed between the
device and the UPS cabinet.
4.
Remove the UPS cabinet top interface conduit landing plates to drill or punch
conduit holes (see Figure 4‐4 on page 4-8).
5.
Reinstall the conduit landing plate.
6.
Install conduit between the UPS and RMP II. See Figure 5‐12 on page 5-15 for
RMP II knockout hole location.
7.
Install wiring between the UPS and RMP II. See Figure 5‐2 and Table 5‐1 for the
Powerware Hot Sync CAN Bridge Card terminal location and wiring information,
and Figure 5‐7, Figure 5‐8, and Table 5‐5 for the RMP II terminal location and
wiring information.
NOTE
120 Vac for the RMP II should be supplied from the critical bus by facility planners or the customer.
8.
Install 120 Vac power wiring from the critical bus to the RMP II. See Figure 5‐7,
Figure 5‐8, and Table 5‐5 for the terminal location and wiring information.
9.
Close the front door and secure the latch.
10.
If removed, reinstall the safety shield panel removed in paragraph 5.1, Step 5.
Secure with the retained hardware.
11.
If removed, reinstall the left front panel removed in paragraph 5.1, Step 4 and
secure with the retained hardware.
12.
Restart the UPS. See Chapter 7, “UPS Operating Instructions,” for startup
instructions.
Terminal TB1
Signal Connections
from the UPS
Ground
Terminal
Terminal TB3
120 Vac Power
Figure 5‐7. Remote Monitor Panel II and Remote Monitor Panel II Terminal Locations