UPS INSTALLATION PLAN AND UNPACKING
Power Xpert
9395 UPS (450–550 kVA) Installation and Operation Manual
164201701 Rev 3
www.eaton.com/powerquality
3-20
2.
Use a forklift or pallet jack to move the packaged cabinet to the installation site,
or as close as possible, before unpacking. If possible, move the cabinet using the
pallet. Insert the forklift or pallet jack forks from the right side of the pallet (facing
the cabinet), between the supports on the bottom of the pallet (see Figure 3‐6 on
page 3-6 for the UPS cabinet center of gravity measurements). If the cabinet
must be moved using the cabinet front or rear fork lift slots, see the caution
statement at the beginning of this procedure.
C
A
U
T
I
O
N
Do not tilt the UPS cabinet more than 10° from vertical or the cabinet may tip over.
3.
Set the pallet on a firm, level surface, allowing a minimum clearance of 3m (10 ft)
on each side for removing the cabinet from the pallet.
NOTE
The UPS cabinet is shipped with debris shields covering the ventilation grills on top of the unit. Do
not remove the debris shields until installation is complete.
4.
Remove the protective covering from the cabinet.
5.
Remove the packing material, and discard or recycle in a responsible manner.
6.
Inspect the contents for any evidence of physical damage, and compare each
item with the Bill of Lading. If damage has occurred or shortages are evident,
contact an Eaton service representative immediately to determine the extent of
the damage and its impact on further installation.
NOTE
While waiting for installation, protect the unpacked cabinet from moisture, dust, and other harmful
contaminants. Failure to store and protect the UPS properly may void your warranty.
Содержание Power Xpert Plus 1
Страница 1: ...Power Xpert 9395 UPS and Plus 1 UPS 450 550 kVA Installation and Operation Manual...