INSTALLING OPTIONS AND ACCESSORIES
Power Xpert
9395 UPS (450–550 kVA) Installation and Operation Manual
164201701 Rev 3
www.eaton.com/powerquality
5-13
7.
Install wiring between the UPS and SCM II. See Figure 5‐2 and Table 5‐1 for the
Powerware Hot Sync CAN Bridge Card terminal location and wiring information,
and Figure 5‐10, Figure 5‐8, and Table 5‐5 for the SCM II terminal location and
wiring information.
NOTE
120 Vac for the SCM II should be supplied from the critical bus by facility planners or the customer.
8.
Install 120 Vac power wiring from the critical bus to the SCM II. See Figure 5‐10,
Figure 5‐8, and Table 5‐5 for the terminal location and wiring information.
Ground
Terminal
Terminal TB1 Signal
Connections from the UPS
Terminal TB3
120 Vac Power
Terminal TB2 Customer
Supervisory Contact Interface
Figure 5‐10. Supervisory Contact Module II Terminal Location
NOTE
Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an authorized Eaton
Customer Service Engineer. Contact an Eaton service representative to schedule a date.
9.
Install wiring between the SCM II terminal block TB2 and the monitoring
equipment. See Figure 5‐10 for terminal block location and Figure 5‐11 for
terminal assignments.
10.
Close the front door and secure the latch.
11.
If removed, reinstall the safety shield panel removed in paragraph 5.1, Step 5.
Secure with the retained hardware.
12.
If removed, reinstall the left front panel removed in paragraph 5.1, Step 4 and
secure with the retained hardware.
13.
Restart the UPS. See Chapter 7, “UPS Operating Instructions,” for startup
instructions.