Putting the SmartWire Darwin
network into operation
57
02/09 AWB2723-1612en
Table 6: Signals of the SmartWire Darwin configuration
LED
If all status displays indicate a green continuous light,
startup has been completed successfully.
Description
SmartWire Darwin-
configurations LED
Data exchange gateway
via the CANopen to PLC
The planned configuration complies with
the gateway target configuration.
Green continuous light
yes
The planned configuration does not
comply with the gateway target
configuration, but is compatible with it.
(List of the devices that are compatible
with one another
Flashing (green)
yes
The planned configuration and the
gateway target configuration are not
compatible.
Red continuous light
No
Содержание Moeller SmartWire-Darwin EU5C-SWD-CAN
Страница 8: ...4 02 09 AWB2723 1612en ...
Страница 28: ...24 02 09 AWB2723 1612en ...
Страница 56: ...52 02 09 AWB2723 1612en ...
Страница 62: ...58 02 09 AWB2723 1612en ...