246
Maintenance
4812313240.pdf
2017-12-1
Funnel rubber of transfer point and sealing
rubbers / guides
On the primary and discharge conveyors, different
rubber parts are provided to guarantee
problem-free material removal. These rubber
parts should be visually checked for damage
weekly:
- scraper rubber (1)
- lateral seal (2)
- lateral guide of primary conveyor (3)
- discharge funnel (4)
- primary funnel (5)
- lateral guide of discharge conveyor (6)
All rubber parts are installed with screw
connections and can be easily removed when
required.
- Remove the fastening screws and the
damaged part.
-
Properly mount the new part and tighten the
fastening screws.
Fig. 1. Scraper rubber
2. Lateral seal
3. Lateral guide for primary
conveyor
4. Discharge funnel
5. Primary funnel
6. Lateral guide for
discharge conveyor
Содержание PL2000F
Страница 2: ......
Страница 15: ...Introduction 4 4812313240 pdf 2017 12 1...
Страница 29: ...Safety General instructions 18 4812313240 pdf 2017 12 1...
Страница 33: ...Special instructions 22 4812313240 pdf 2017 12 1...
Страница 35: ...Technical specifications 24 4812313240 pdf 2017 12 1 Dimensions...
Страница 41: ...Technical specifications 30 4812313240 pdf 2017 12 1...
Страница 56: ...Machine description 45 4812313240 pdf 2017 12 1 Decals...
Страница 57: ...Machine description 46 4812313240 pdf 2017 12 1...
Страница 58: ...Machine description 47 4812313240 pdf 2017 12 1...
Страница 66: ...Machine description 55 4812313240 pdf 2017 12 1 Switch panel Main console left right...
Страница 68: ...Machine description 57 4812313240 pdf 2017 12 1...
Страница 70: ...Machine description 59 4812313240 pdf 2017 12 1...
Страница 72: ...Machine description 61 4812313240 pdf 2017 12 1...
Страница 74: ...Machine description 63 4812313240 pdf 2017 12 1...
Страница 76: ...Machine description 65 4812313240 pdf 2017 12 1...
Страница 78: ...Machine description 67 4812313240 pdf 2017 12 1...
Страница 80: ...Machine description 69 4812313240 pdf 2017 12 1 Control lever panel...
Страница 82: ...Machine description 71 4812313240 pdf 2017 12 1 LH RH Ergo control...
Страница 92: ...Machine description 81 4812313240 pdf 2017 12 1...
Страница 173: ...Machine description 162 4812313240 pdf 2017 12 1...
Страница 190: ...Miscellaneous 179 4812313240 pdf 2017 12 1 Fix points Fig Fix points...
Страница 207: ...Operating instructions 196 4812313240 pdf 2017 12 1...
Страница 209: ...Preventive maintenance 198 4812313240 pdf 2017 12 1...
Страница 211: ...Maintenance Lubricants and symbols 200 4812313240 pdf 2017 12 1...
Страница 274: ...Maintenance 263 4812313240 pdf 2017 12 1...