2–6
Installation
2.
Rock the unit into place. An audible ‘‘click’’ is heard when the unit is
securely latched in place.
3.
With the power applied to the backplane, the following indicators on
the DECserver 90L should be lit: Power, Self-Test OK, and Network.
The self-test takes approximately five seconds to complete.
L J - 0 0 0 7 4 - T I 0
Figure 2–3
DECserver 90L Backplane Installation