3 - MAINTENANCE
74
TIE A PIECE OF WIRE TO THE
TIMING CHAIN TO PREVENT
IT FROM DROPPING INTO THE
ENGINE.
5. Extract:
- The 2 locking pins (8).
- The 8 bolts (9) from the camshaft bridge (loosen them
by following a cross pattern).
- The camshaft bridge (10).
- The inlet camshaft (11).
- The exhaust camshaft (12).
THE INLET CAMSHAFT BEARS
THE INSCRIPTION “A”.
THE EXHAUST CAMSHAFT
BEARS THE INSCRIPTION “S”
6.
Extract:
- The shims with the incorrect settings and make a note of the
numbering (3 digit number) of the fitted shim (13).
7.
Calculate:
- The appropriate shim according to the following calcula-
tion: New shim thickness = (B – A) + C (mm)
Where
A= indicated clearance (inlet or exhaust)
B = Value measured using the feeler gauge
C = Thickness of the fitted shim
Example (exhaust valve):
A = 0.20 mm (indicated or desired value)
B= 0,15 mm
C= 2,00 mm
Thickness of new shim = (0,15-0,20) + 2,00 = 1,95 mm
8
9
10
12
11
13
N.B.
N.B.
Содержание GPR 125 Racing
Страница 1: ...WORKSHOP MANUAL GPR 125 4 stroke ...
Страница 30: ...2 PDI Pre delivery inspection 30 2 PDI Pre delivery inspection PDI Pre delivery inspection 31 2 1 ...
Страница 169: ...6 COOLING SYSTEM 169 6 1 DIAGRAM OF THE SYSTEM ...
Страница 170: ...6 COOLING SYSTEM 170 ...
Страница 179: ...7 LUBRICATION SYSTEM 179 7 1 DIAGRAM OF THE SYSTEM ...
Страница 180: ...7 LUBRICATION SYSTEM 180 ...
Страница 192: ...8 CHASSIS 192 FITTING FRONT SUSPENSION ...
Страница 202: ...9 BRAKING SYSTEM 202 9 BRAKING SYSTEM FRONT BRAKE REAR BRAKE 203 211 9 1 9 2 ...
Страница 247: ...Rev 0 2009 ...