4 - ENGINE
116
Roll the guide bar on a flat surface.
Warping =>
Renew.
DO NOT TRY AND STRAIGHTEN
A WARPED BAR.
4. Check:
- Movement of the gear change forks (in the guide bar)
Uneven movement =>
Renew the fork and the bar.
IF THE GEAR CHANGE FORK
AND THE DRIVE SPROCKETS
ARE DAMAGED, RENEW THE
SPROCKETS TO EITHER SIDE
ALL TOGETHER.
5. Inspect:
- Gear teeth.
Blue colouring/grooves/wear =>
Renew.
- Gear claws
Rounded edges/cracks/pieces missing =>
Renew.
6. Check:
- Length of the secondary shaft pack (A):
92’2mm (+010 - 0,18mm).
CAUTION
A
N.B.
Содержание GPR 125 Racing
Страница 1: ...WORKSHOP MANUAL GPR 125 4 stroke ...
Страница 30: ...2 PDI Pre delivery inspection 30 2 PDI Pre delivery inspection PDI Pre delivery inspection 31 2 1 ...
Страница 169: ...6 COOLING SYSTEM 169 6 1 DIAGRAM OF THE SYSTEM ...
Страница 170: ...6 COOLING SYSTEM 170 ...
Страница 179: ...7 LUBRICATION SYSTEM 179 7 1 DIAGRAM OF THE SYSTEM ...
Страница 180: ...7 LUBRICATION SYSTEM 180 ...
Страница 192: ...8 CHASSIS 192 FITTING FRONT SUSPENSION ...
Страница 202: ...9 BRAKING SYSTEM 202 9 BRAKING SYSTEM FRONT BRAKE REAR BRAKE 203 211 9 1 9 2 ...
Страница 247: ...Rev 0 2009 ...