4 - ENGINE
84
4 - ENGINE
IDENTIFICATION OF SETS ......................................................
REMOVING THE ENGINE FROM THE FRAME ........................
DISMANTLING THE ENGINE ...................................................
INSPECTING THE ENGINE ELEMENTS ....................................
ASSEMBLING THE ENGINE ........................................................
FITTING THE ENGINE INTO THE FRAME ..............................
85
89
91
104
119
150
4.1 -
4.2 -
4.3 -
4.4 -
4.5 -
4.6 -
Содержание GPR 125 Racing
Страница 1: ...WORKSHOP MANUAL GPR 125 4 stroke ...
Страница 30: ...2 PDI Pre delivery inspection 30 2 PDI Pre delivery inspection PDI Pre delivery inspection 31 2 1 ...
Страница 169: ...6 COOLING SYSTEM 169 6 1 DIAGRAM OF THE SYSTEM ...
Страница 170: ...6 COOLING SYSTEM 170 ...
Страница 179: ...7 LUBRICATION SYSTEM 179 7 1 DIAGRAM OF THE SYSTEM ...
Страница 180: ...7 LUBRICATION SYSTEM 180 ...
Страница 192: ...8 CHASSIS 192 FITTING FRONT SUSPENSION ...
Страница 202: ...9 BRAKING SYSTEM 202 9 BRAKING SYSTEM FRONT BRAKE REAR BRAKE 203 211 9 1 9 2 ...
Страница 247: ...Rev 0 2009 ...