3 - MAINTENANCE
55
INSPECTING THE EXHAUST SYSTEM
1. Inspect:
- The nuts (1).
Loose/damaged => Tighten/renew.
- Gasket (exhaust pipe).
Leaking exhaust fumes => Tighten/renew.
The nuts:
1,7-1,9 N.m (17-19 kgf.m)
2. Inspect:
- The clamp (2) joining the exhaust pipe to the silencer.
Loose/damaged => Tighten/renew.
Clamp tightening torque:
0,8-1 N.m (8-10 kgf.m)
INSPECTING THE AIS VALVE (SECONDARY AIR)
1. Inspect:
- The pipes:
- Air inlet from the air filter box (1).
- Breather inlet (2).
- Air outlet to the cylinder head (3).
Loose/damaged => Connect/renew.
1
2
1
2
3
Содержание GPR 125 Racing
Страница 1: ...WORKSHOP MANUAL GPR 125 4 stroke ...
Страница 30: ...2 PDI Pre delivery inspection 30 2 PDI Pre delivery inspection PDI Pre delivery inspection 31 2 1 ...
Страница 169: ...6 COOLING SYSTEM 169 6 1 DIAGRAM OF THE SYSTEM ...
Страница 170: ...6 COOLING SYSTEM 170 ...
Страница 179: ...7 LUBRICATION SYSTEM 179 7 1 DIAGRAM OF THE SYSTEM ...
Страница 180: ...7 LUBRICATION SYSTEM 180 ...
Страница 192: ...8 CHASSIS 192 FITTING FRONT SUSPENSION ...
Страница 202: ...9 BRAKING SYSTEM 202 9 BRAKING SYSTEM FRONT BRAKE REAR BRAKE 203 211 9 1 9 2 ...
Страница 247: ...Rev 0 2009 ...