4 - ENGINE
93
7. Remove:
- The starter motor connector
- The 2 bolts (10) securing the starter motor.
- The starter motor (11).
REMOVE THE STARTER MOTOR
TO ENABLE EASY EXTRACTION
OF THE TIMING CHAIN TEN-
SIONER .
8. Remove:
- First of all the central timing chain tensioner bolt (12).
- The 2 bolts (13) securing the timing chain tensioner.
- The timing chain tensioner.
- The tensioner seal.
ON DISMANTLING THE TI-
MING, ALWAYS REMOVE THE
CENTRAL TIMING CHAIN BOLT
FIRST OF ALL. FAILURE TO DO
SO MAY LEAD TO SEVERE DA-
MAGE TO THE TIMING CHAIN.
9. Fit:
- The camshaft sprocket locking tool (14)
.
The camshaft sprocket locking tool:
Ref.
865259
10. Remove:
- The 2 bolts (15) from the camshaft sprockets.
- The camshaft sprockets (16).
11
10
12
12
13
14
15
16
CAUTION
N.B.
Содержание GPR 125 Racing
Страница 1: ...WORKSHOP MANUAL GPR 125 4 stroke ...
Страница 30: ...2 PDI Pre delivery inspection 30 2 PDI Pre delivery inspection PDI Pre delivery inspection 31 2 1 ...
Страница 169: ...6 COOLING SYSTEM 169 6 1 DIAGRAM OF THE SYSTEM ...
Страница 170: ...6 COOLING SYSTEM 170 ...
Страница 179: ...7 LUBRICATION SYSTEM 179 7 1 DIAGRAM OF THE SYSTEM ...
Страница 180: ...7 LUBRICATION SYSTEM 180 ...
Страница 192: ...8 CHASSIS 192 FITTING FRONT SUSPENSION ...
Страница 202: ...9 BRAKING SYSTEM 202 9 BRAKING SYSTEM FRONT BRAKE REAR BRAKE 203 211 9 1 9 2 ...
Страница 247: ...Rev 0 2009 ...