4 - ENGINE
151
5. Fit:
- The coolant temperature sensor (6).
- The AIS valve (7).
- The pipe from the radiator to the thermostat (8).
6. Fit:
- The clutch cable (9).
- The oil pressure sensor cable (10).
7. Fit:
- The gear lever bolt (11).
- The gear lever.
- The neutral sensor cable.
Gear lever bolt
0,8-1 kgf.m (8-10 N.m)
8. Fit:
- The spark plug connector cap.
- The rocker cover oil vapour breather pipe (rocker cover-air
filter box).
- The fuel tank (connecting its pipes).
- The seat.
11
9
10
8
6
7
Содержание GPR 125 Racing
Страница 1: ...WORKSHOP MANUAL GPR 125 4 stroke ...
Страница 30: ...2 PDI Pre delivery inspection 30 2 PDI Pre delivery inspection PDI Pre delivery inspection 31 2 1 ...
Страница 169: ...6 COOLING SYSTEM 169 6 1 DIAGRAM OF THE SYSTEM ...
Страница 170: ...6 COOLING SYSTEM 170 ...
Страница 179: ...7 LUBRICATION SYSTEM 179 7 1 DIAGRAM OF THE SYSTEM ...
Страница 180: ...7 LUBRICATION SYSTEM 180 ...
Страница 192: ...8 CHASSIS 192 FITTING FRONT SUSPENSION ...
Страница 202: ...9 BRAKING SYSTEM 202 9 BRAKING SYSTEM FRONT BRAKE REAR BRAKE 203 211 9 1 9 2 ...
Страница 247: ...Rev 0 2009 ...