2 - PDI (Pre-delivery inspection)
31
Checking the assembly and preparing the machine for delivery to the first
purchaser (PDI).
PREPARATION
UNPACKING - check for damage and missing parts.
FRONT AND REAR BRAKES – clean, inspect.
ENGINE OIL – Check level.
FUEL TANK AND TAP – Check for leaks. Fill with fuel.
COOLANT – Check level.
BATTERY – Fill with electrolyte, charge, fit.
TYRES – Inflate to correct pressure.
TRANSMISSION CHAIN – Check the tension (Adjust if necessary).
ACCELERATOR – Check that cable, adjustment and functioning are correct.
CARBURETTOR – Check, adjust idling.
CLUTCH – Adjust cable and lever, and check functioning.
SPARK PLUG – Tighten, check connector cap.
ELECTRICAL SYSTEM – Check and adjust headlight(s). Check sidelight, instrument panel lights, brake light, turn
indicators, horn and instrument panel indicator lights.
LUBRICATION – Lubricate elements indicated in the User’s Manual.
CHECK THE FOLLOWING TIGHTENING TORQUES:
FRONT WHEEL SHAFT: 7 - 8 kgf.m
FRONT BRAKE CALLIPER: 3.5 - 4 kgf.m
TOP PLATE CLOSING BOLTS: 1.7 – 1.9 kgf.m
SEMI-HANDLEBARS: 1.7 – 1.9 kgf.m
CENTRAL STEERING NUT: 4-5 kgf.m
REAR WHEEL SHAFT: 7 - 8 kgf.m
REAR BRAKE CALLIPER: 2.5 kgf.m
SWINGING ARM SHAFT: 7 - 8 kgf.m
OIL DRAIN PLUG: 2,4 - 2,6 kgf.m
RETIGHTENING VARIOUS ITEMS:
Fairings 0.8-1kgf.m
Lowering of rear-view mirrors 2.5 kgf.m
Rear-view mirror to fairing 0.8-1 kgf.m
Brake/Clutch levers
Light switches.
Содержание GPR 125 Racing
Страница 1: ...WORKSHOP MANUAL GPR 125 4 stroke ...
Страница 30: ...2 PDI Pre delivery inspection 30 2 PDI Pre delivery inspection PDI Pre delivery inspection 31 2 1 ...
Страница 169: ...6 COOLING SYSTEM 169 6 1 DIAGRAM OF THE SYSTEM ...
Страница 170: ...6 COOLING SYSTEM 170 ...
Страница 179: ...7 LUBRICATION SYSTEM 179 7 1 DIAGRAM OF THE SYSTEM ...
Страница 180: ...7 LUBRICATION SYSTEM 180 ...
Страница 192: ...8 CHASSIS 192 FITTING FRONT SUSPENSION ...
Страница 202: ...9 BRAKING SYSTEM 202 9 BRAKING SYSTEM FRONT BRAKE REAR BRAKE 203 211 9 1 9 2 ...
Страница 247: ...Rev 0 2009 ...