Delta SCARA Robot System User Manual
SCARA CE Series
143
8.1 Robot and power control box installation
8.1.1 Robot installation
The installation of the robot should be as shown in Figure 8.1 below; lock the base on a flat surface
using M8 flat gaskets, and lock it tight by using the locking torque (20N-m) instructed.
Figure8. 1
Robot installation screw lock position
4-M8 oval screws
DRS40/50/60/70L series
DRS60H series
Содержание DRS40L3SOADF003
Страница 1: ...Delta SCARA Robot System User Manual SCARA CE Series 1 ...
Страница 59: ...Delta SCARA Robot System User Manual SCARA CE Series 59 ...
Страница 64: ...Delta SCARA Robot System User Manual SCARA CE Series 64 Figure4 5 DRS70L series dimensions figure ...
Страница 113: ...Delta SCARA Robot System User Manual SCARA CE Series 113 ...
Страница 115: ...Delta SCARA Robot System User Manual SCARA CE Series 115 ...
Страница 129: ...Delta SCARA Robot System User Manual SCARA CE Series 129 ...