SiSG121917E
Pump Down Operation
Part 7 Trial Operation and Field Settings
182
Reference
1. Pump Down Operation
Outline
In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing of the unit.
Detail
1. Remove the valve caps from the liquid stop valve and the gas stop valve.
2. Carry out forced cooling operation.
3. After
A
minutes, close the liquid stop valve with a hexagonal wrench.
4. After
B
minutes, close the gas stop valve and stop the forced cooling operation.
R7000252
Refer to page 183 for forced operation.
A
B
50/65/80 class
1
5 ~ 6
90 class
3
5 ~ 6
Gas stop
valve
Close
Hexagonal
wrench
Liquid stop
valve
Valve cap
Содержание FDMR50TVMG
Страница 185: ...SiSG121917E Check Part 6 Service Diagnosis 180 50 65 80 class 90 class V U DC DC R22378 W R21130 W V U DCP2 DCM2 ...
Страница 212: ...Piping Diagrams SiSG121917E 207 Part 8 Appendix MKS65TVMG MKB65TVMG MKS80TVMG 3D103941A 3D103942A ...
Страница 213: ...SiSG121917E Piping Diagrams Part 8 Appendix 208 MKS90TVMG 3D104086 ...
Страница 223: ...SiSG121917E Operation Limit Part 8 Appendix 218 3 Operation Limit MKS50 65 80 90TVMG MKB50 65TVMG 4D078793B ...