7
|
Installation
Installer reference guide
100
C08AF + EHYKOMB33A
Daikin Altherma R Hybrid
4P471761-1E – 2020.10
NOTICE
When closing the indoor unit cover, make sure that the tightening torque does NOT
exceed 4.1 N•m.
Before doing the configuration of the heat pump module, make sure that the
hybrid module and gas boiler are installed correctly.
7.15 Finishing the gas boiler installation
7.15.1 To perform an air purge on the gas supply
1
Turn once the screw counterclockwise.
Result:
Gas supply will purge air.
2
Check all connections for leakage.
3
Check the gas supply pressure.
INFORMATION
Make sure the working inlet pressure does NOT interfere with other gas appliances
installed.
7.15.2 To close the gas boiler
1
Hook the top of the front panel into the top of the gas boiler.