7
|
Installation
Installer reference guide
79
C08AF + EHYKOMB33A
Daikin Altherma R Hybrid
4P471761-1E – 2020.10
X2M
X1M
1
2
3
X5M
1 2 3
1 2 3
a
a
Interconnection cable (=main power supply)
2
Fix the cable with cable ties to the cable tie mountings.
7.10.6 To connect the main power supply of the gas boiler
1
Connect the power supply cable of the gas boiler to a fuse (a) (L: X2-2 (BRN),
N: X2-4 (BLU)).
2
Connect the earthing of the gas boiler to an earthing terminal.
Result:
The gas boiler performs a test. appears on the service display. After the
test, appears on the service display (wait mode). The pressure in bar is shown on
the main display.
a
X2
DANGER: RISK OF ELECTROCUTION
A fused spur or an unswitched socket MUST be located no more than 1 m from the
appliance.