7
|
Installation
Installer reference guide
97
C08AF + EHYKOMB33A
Daikin Altherma R Hybrid
4P471761-1E – 2020.10
CAUTION
Read the installation manuals of the field supplied parts.
The horizontal flue MUST be installed under a 3° fall towards the boiler (50 mm per
metre) and MUST be supported with a minimum of 1 bracket at each meter length.
Best recommended position of the bracket is just before the joint.
INFORMATION
Flexible flue gas lines may NOT be used in horizontal connection sections.
7.12.9 Fitting a vertical flue system
A vertical 60/100 mm flue kit is also available. By using additional components
available from your boiler supplier, the kit can be extended up to a maximum
length as specified in the table indicating the maximum pipe lengths (excluding the
initial boiler connection).
CAUTION
Read the installation manuals of the field supplied parts.
7.12.10 Plume management kit
See the local and national regulations.
Especially for UK:
The plume management kit comprises of a 710 mm horizontal section elbow to
connect the 500 mm vertical condensing tube, which has a horizontal or vertical
terminal dependant on your requirements. The maximum length of the horizontal
flue including the terminal but excluding the initial elbow from the boiler and
500 mm vertical condensing tube is 7 m.