READ ALL INSTRUCTIONS AND INSTALLATION INSTRUC-
TIONS THOROUGHLY. FAILURE TO FOLLOW THE INSTRUC-
TIONS COULD RESULT IN SERIOUS BODILY INJURY AND/OR
PROPERTY DAMAGE.
CAUTION:
Check to be sure power source is adequate for handling
the voltage requirements of the pump, as indicated on the pump
nameplate.
Make sure the pump electrical supply circuit is equipped with
fuses or circuit breakers for proper capacity. A separate branch
circuit is recommended, sized according to NEC code for current
shown on the pump nameplate.
Pump should be checked frequently for debris and/or build up
which may interfere with the floats on and off position.
A check valve is to be used to reduce unnecessary cycling of pump.
This pump is not intended (designed) to be used for handling raw
sewage.
SAFETY GUIDELINES
INSPECTION
Inspect unit for any visible damage caused by shipping. Contact
dealer if unit appears to be damaged.
INSTALLATION INSTRUCTIONS
Read all instructions before beginning installation.
Be sure the installation does not exceed the maximum vertical lift
(head) of 20 ft.
Use backfill gravel that is larger than the holes in the basin. Not
doing so will cause damage to the pump which will void the warranty.
Select an area that collects water, typically near the foundation,
and dig a hole approximately 1 ft. larger in diameter and deep enough
to allow the tank lid to be about 2" above the ground.
Make sure the basin is level to within 1/8" across the diameter.
Install check valve to pump, hand tight is sufficient. Snap in the 2"
grommet in the cover. Thread hose through the 2" grommet and
connect hose to check valve using hose clamp provided. Feed the
pump power cord through the other hole in the cover. Feed the
discharge hose out away from the house (see illustration).
To test, plug the pump in and run water into the basin until the
pump switches on. If the pump does not switch on refer to trouble
shooting information in the instruction sheet for the pump.
Secure the cover to the basin. Do not over-torque the cover bolts.
1
Little Giant Pump Company
P. O. Box 12010
Oklahoma City, OK 73157-2010
405.947.2511 • Fax: 405.947.8720
www.LittleGiant.com
CS-SS
Crawl Space Sump System
Système de puisard pour
vide sanitaire
Sistema de sumidero para
espacio de servicio
Instruction sheet, grommets
and hardware in polybag
Feuillet d’instructions, œillets et
ferrures dans le sac de polyéthylène
Hoja de instrucciones, arandelas y
herrajes en bolsa de polietileno
Connect to a 115V grounded outlet
Brancher à une prise 115 V
mise à la terre
Conectar a toma de corriente de
115V puesta a tierra
Large gravel backfill
Remblai de gros gravier
Relleno grande de grava
Earth • Terre • Tierra
CS-SS Pre-Packaged Basin Assembly
Assemblage de bassin préemballé
Ensamblado de la cubeta preembalado
14940655
Typical Installation
Installation typique
Instalación típica
Cover • Couvercle • Tapa
14940654
Coiled flex tubing
Flexible en serpentin
Tubería flexible en espiral
599301
6E-CIA-SFS
506701
Check Valve
Clapet anti-retour
Válvula de retención
577130
Perforated Basin
Bassin perforé
Cubeta perforada
14940653
Crawl Space Area
Vide sanitaire
Área del espacio de servicio
Floor Joist
Solive de plancher
Vigueta de soporte
del piso
Stem Wall
Mur de fondation
Cimiento en forma
de T invertida
Check Valve
Clapet anti-retour
Válvula de retención
Footing
Semelle
Zócalo
Frost Line
Profondeur de gel
Profundidad de la
altura de helada
Slope discharge pipe away from
foundation and below frost line
Donner une pente au conduit
d’évacuation dans la direction opposée
à la fondation et sous la profondeur de gel
Incline la tubería de descarga,
alejándola de la base y por debajo
de la profundidad de la altura de helada.
PVC Pipe • Conduit de
PVC • Tubería de PVC