Apr. 2007
8
-5
DSC48
Loading and unloading the combine harvester to the
transporting vehicle ...................................... 0-20
Location of decals.............................................. 0-25
Loctite and liquid gasket application ...................1-11
Loctite application ...............................................1-11
Long-term storage ..............................................0-11
Lubricating system check .................................. 2-53
Lubricating system speci
fi
cations ...................... 2-27
Lubricating system............................................... 2-9
M
Maintenance schedule table (* If there is any faulty
part, replace it.) .............................................. 1-6
Maintenance ........................................................ 5-4
Motor protection................................................. 7-21
Muf
fl
er................................................................ 2-20
N
No. 1 alarm (alarm buzzer and instrument panel) . 7-6
No. 1 alarm and No. 2 alarm ............................. 7-14
No. 2 alarm (alarm buzzer and instrument panel) . 7-7
No. 2 auger ........................................................ 4-18
O
Oil and coolant change schedule......................... 1-10
Oil
fi
lter and relief valve ........................................ 2-10
Oil lamp (instrument panel) .................................. 7-10
Oil pump ................................................................. 2-9
Oil speci
fi
cation and capacity .............................. 1-13
Oil switch troubleshooting .................................... 7-15
Oil switch .............................................................. 2-10
Operation in
fi
eld ...................................................0-11
Operation of automatic feeding depth control lamp
........................................................................ 7-21
Other bolts and nuts, LOCTITE and grease applica-
tion .................................................................. 3-23
Output stop of shallow and deep feeding motors 7-21
Overview for feeding depth control ...................... 7-19
Overview for HST ................................................. 6-16
Overview for hydraulic system ............................... 6-3
Overview for instrument panel ............................... 7-3
Overview for power steering function .................. 7-26
Overview for self-diagnosis .................................. 7-32
Overview ................................................................ 1-3
P
Piston and piston ring ............................................ 2-6
Power brake cable ................................................. 5-5
Power steering ...................................................... 6-4
Power steering function ....................................... 7-26
Preparation and inspection .................................... 0-9
Pressure check ................................................... 6-20
Prevention of scald ................................................ 0-8
Problems involved with lifting and lowering reaping
unit .................................................................. 7-30
Problems involved with turning and cornering ..... 7-31
Pump and motor .................................................. 6-18
R
Radiator cap ......................................................... 2-12
Radiator ................................................................ 2-12
Reaping unit lifting solenoid valve ......................... 6-9
Reaping unit lowering solenoid valve .................... 6-9
Reaping unit ........................................................... 3-3
Rear section of threshing cylinder ......................... 4-6
Removal after detaching reaping unit .................. 6-26
Removal and installation of blower ...................... 4-15
Removal and installation of hydraulic system...... 6-15
Removal and installation of No. 2 auger .............. 4-18
Removal and installation of Separator drum and No.
2 processing cylinder ...................................... 4-19
Removal and installation of sieve case ............... 4-20
Removal and installation of straw discharging chain
........................................................................ 4-27
Removal and installation of threshing cylinder con-
cave................................................................. 4-10
Removal and installation of threshing cylinder .... 4-12
Removal and installation of vertical auger and No. 1
auger ............................................................... 4-16
Removal of axle oil seal ....................................... 5-12
Removal of components for sieve case ............... 4-22
Removal of components related to rocker shaft .. 4-23
Removal of feeding depth control motor and limit
switch ............................................................. 7-25
Removal of feeding depth control motor .............. 7-25
Removal of HST .................................................. 6-25
Removal of transmission case ............................... 5-9
Removal of valve unit .......................................... 6-15
Содержание DSC48
Страница 1: ...DSC48 COMBINE HARVESTER WORKSHOP MANUAL...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 38: ...MEMO...
Страница 40: ......
Страница 106: ......
Страница 136: ...MEMO...
Страница 138: ......
Страница 140: ......
Страница 160: ...MEMO...
Страница 162: ......
Страница 196: ...MEMO...
Страница 198: ......
Страница 216: ......
Страница 251: ...Apr 2007 7 11 DSC48 2 3 WIRING DIAGRAM 417W717A...
Страница 262: ...7 22 Apr 2007 DSC48 4 3 WIRING DIAGRAM 417W723A...
Страница 281: ...417W758B B ON GND B GND 7 2 CIRCUIT DIAGRAM Apr 2007 7 41 DSC48...
Страница 282: ......
Страница 285: ...DSC48 INDEX...