4
-16
Apr. 2007
DSC48
1
2
1.6 VERTICAL AUGER AND NO. 1 AUGER
(Replace every 400 hours)
1.6.1 REMOVAL AND INSTALLATION OF
VERTICAL AUGER AND NO. 1 AUGER
1. Remove the No. 1 pulley mounting bolt and belt to re-
move the No. 1 pulley.
<When assembling>
• Adjust the length of the installed spring to adjust the
belt tension.
[No. 1 drive belt]
(1) No. 1 drive belt
(4) No. 2 pulley
(2) No. 2 drive belt
(5) No. 2 tension arm
(3) No. 1 pulley
417W429A
4. Remove the mounting bolts from the vertical auger
pipe.
Remove two bolts on top and four bolts at the bottom to
remove the vertical auger pipe.
(1) Vertical auger pipe
(2) Bolt
2. Remove the mounting nut of the vertical auger cover.
Remove the cover and the No. 1 rotation sensor to-
gether. When removing the cover, match a sponge with
the cover and cut it with a knife.
3. Remove the vertical auger blade (four bolts) and pull
out the vertical auger.
417W430A
417W431A
[No. 2 drive belt]
Standard for dimension A
160 ~ 165 mm
Standard for dimension B
165 ~ 170 mm
Содержание DSC48
Страница 1: ...DSC48 COMBINE HARVESTER WORKSHOP MANUAL...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 38: ...MEMO...
Страница 40: ......
Страница 106: ......
Страница 136: ...MEMO...
Страница 138: ......
Страница 140: ......
Страница 160: ...MEMO...
Страница 162: ......
Страница 196: ...MEMO...
Страница 198: ......
Страница 216: ......
Страница 251: ...Apr 2007 7 11 DSC48 2 3 WIRING DIAGRAM 417W717A...
Страница 262: ...7 22 Apr 2007 DSC48 4 3 WIRING DIAGRAM 417W723A...
Страница 281: ...417W758B B ON GND B GND 7 2 CIRCUIT DIAGRAM Apr 2007 7 41 DSC48...
Страница 282: ......
Страница 285: ...DSC48 INDEX...