The following delays can be set:
•
Sounder Delay
: a delay can be set to postpone the activation of sounders on the Loop and the panel SND output. This
delay offers the option of checking the authenticity of the alarm before the sounders are activated in the protected site.
When “Delay” is enabled, the “
DELAY
” LED on the front of panel 41CPE118 is activated.
•
Fire Br. Delay (alarm transmission)
: a delay can be set to postpone the enabling of the Fire Brigade (Fire R) output on the
panel.
When “Delay” is enabled, the “
DELAY
” LED on the front of panel 41CPE118 is activated.
•
Fire Pr. Delay
: a delay can be set to postpone the enabling of the Fire Protection (Fire P) output on the panel.
When “Delay” is enabled, the “
DELAY
” LED on the front of panel 41CPE118 is activated.
17/06/2020 14:06
Sounder Delay
Fire Br. Delay
Fire Pr. Delay
17/06/2020 14:06
ON
OFF
Mode
Time Schedule
SAVE
More
17/06/2020 14:06
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Time ON
Time OFF
07
00
:
16
00
:
Save
In Schedule mode, the start time (the time at which the delay is activated) and end time (the time at which the delay is
deactivated) must be entered. The time is set for every day of the week. When “Delay” is enabled, the “
DELAY
” LED on the
front of panel 41CPE118 is activated.
After editing, save the changes.
76