Installation
Sea Tel Tracker 6000
26. Remove the shipping hardware that mounts the Equipment Frame assembly to the
pallet of the crate. Discard this hardware.
27.
Using a suitably rated derrick or
crane, lift the Equipment Frame
assembly (approx. weight 2100lbs)
up over the radome base section
and suspend just above the middle
post section.
28.
Rotate the upper post to align the
notch in its base to the notches in
the middle and base pedestal
sections.
29.
Set the upper post section onto
middle post section and assure
that the notches remain aligned.
30.
Apply Loctite to threads of the
mounting bolts. Install the bolts &
washers and tighten to torque
spec.
31. Remove the lifting spreader bracket installed in step 24 above.
3‐11
EAR Controlled - ECCN EAR99
Содержание Sea Tel Tracker 6000
Страница 8: ...SeaTelTracker6000 This Page Intentionally Left Blank viii EAR Controlled ECCN EAR99...
Страница 12: ...SeaTelTracker6000 Safety This Page Intentionally Left Blank 1 2 EAR Controlled ECCN EAR99...
Страница 16: ...SeaTelTracker6000 Site Survey Land Based This Page Intentionally Left Blank 2 4 EAR Controlled ECCN EAR99...
Страница 38: ...SeaTelTracker6000 Setup Testing This Page Intentionally Left Blank 4 2 EAR Controlled ECCN EAR99...
Страница 42: ...SeaTelTracker6000 Maintenance This Page Intentionally Left Blank 5 4 EAR Controlled ECCN EAR99...