Sea Tel Tracker 6000
Installation
3.8.
Connections Into The ODU
1.
Route Main AC Power (220 VAC, 30 Amps) into the radome to Circuit Breaker Box.
2.
Route a ground cable or strap into the radome to Circuit Breaker Box.
3.
Provide a cover over Power, Ground, IFL and any other cables that run across the cement
from the edge of the radome to the antenna pedestal. The cover must protect the cables
and assure that they are not a trip hazard.
4.
Route a ground cable or strap from the
Circuit Breaker Box to one of the 6mm
threaded holes in the top side of the base
plate of the pedestal.
5.
Apply Loctite to threads of a 6mm bolt.
Install the bolt & washer and tighten to
torque spec.
6. Connect CFE IFL Run cables to the IF Interface & 10 MHz Distribution Assembly.
3.9.
Installing Maintenance Mode Switch & Door Sensor
Refer to drawings;
93-164608-A_01 SCHEMATIC, DOOR MUTE SENSOR CIRCUIT
93-165834-A_01 SCHEMATIC MAINTENANCE MODE REMOTE CIRCUIT.
1.
Mount the Maintenance Mode Switch and the Door Sensor in a convenient location near the
radome door.
2.
Route the interconnecting cables under the protective cover across the cement to the Safety
circuit Interface Box.
3.10.
Pedestal Interior Connections
Route the following wires/cables through the pedestal post sections refer to drawings
DL-162776-A SYSTEM BLOCK LIST, GLOBALSTAR TRACKER,
92-162776-A1_DMG_RE_M SYSTEM BLOCK DIAGRAM, GLOBALSTAR TRACKER
93-164211-A01 SCHEMATIC, TRACKER 6000 SYSTEM, GLOBALSTAR;
1.
Route power & ground wires from the Power Ring through the post sections to the Circuit
Breaker Box.
2.
Route the coax cables from the Power Ring through the post sections to the IF Interface & 10
MHz Distribution Assembly.
3.
Route Door Sensor wire from the Power Ring through the post sections to the Circuit Breaker
Box.
3‐18
EAR Controlled - ECCN EAR99
Содержание Sea Tel Tracker 6000
Страница 8: ...SeaTelTracker6000 This Page Intentionally Left Blank viii EAR Controlled ECCN EAR99...
Страница 12: ...SeaTelTracker6000 Safety This Page Intentionally Left Blank 1 2 EAR Controlled ECCN EAR99...
Страница 16: ...SeaTelTracker6000 Site Survey Land Based This Page Intentionally Left Blank 2 4 EAR Controlled ECCN EAR99...
Страница 38: ...SeaTelTracker6000 Setup Testing This Page Intentionally Left Blank 4 2 EAR Controlled ECCN EAR99...
Страница 42: ...SeaTelTracker6000 Maintenance This Page Intentionally Left Blank 5 4 EAR Controlled ECCN EAR99...