Table of Contents
Sea Tel Tracker 6000
1.
SAFETY
............................................................................................................................................... 1-1
2.
SITE SURVEY – LAND BASED
......................................................................................................... 2-1
2.1.
S
ITE
S
ELECTION
.......................................................................................................................................... 2‐1
2.2.
A
NTENNA
S
HADOWING
(B
LOCKAGE
)
AND
RF I
NTERFERENCE
......................................................................... 2‐1
2.3.
M
OUNTING
F
OUNDATION
............................................................................................................................. 2‐2
2.3.1.
Mounting on a Concrete Pad
........................................................................................................................................
2
‐
2
2.4.
B
ELOW
D
ECKS
E
QUIPMENT
L
OCATION
.......................................................................................................... 2‐2
2.5.
C
ABLES
....................................................................................................................................................... 2‐2
2.5.1.
ADE/BDE Coaxial Cables
..................................................................................................................................................
2
‐
2
2.5.2.
Antenna Power Cable
.........................................................................................................................................................
2
‐
3
2.5.3.
ACU Power Cable/Outlet
..................................................................................................................................................
2
‐
3
2.5.4.
Gyro Compass Cable
...........................................................................................................................................................
2
‐
3
2.6.
G
ROUNDING
................................................................................................................................................ 2‐3
3. INSTALLATION ................................................................................................................................... 3-1
3.1.
G
ENERAL
C
AUTIONS
& W
ARNINGS
............................................................................................................... 3‐1
3.2.
P
REPARATION
............................................................................................................................................. 3‐1
3.3.
P
REPARING
L
OCATION FOR THE
O
UT
D
OOR
U
NIT
(ODU)
............................................................................. 3‐2
3.3.1.
Lay Out ODU Mounting Holes
......................................................................................................................................
3
‐
2
3.3.2.
Open General Assembly Crate
.....................................................................................................................................
3
‐
2
3.3.3.
Mount the Base section of the Pedestal
...............................................................................................................
3
‐
3
3.3.4.
Open Radome Crates (2)
................................................................................................................................................
3
‐
3
3.3.5.
Assembling the Bottom Layer of the Radome
................................................................................................
3
‐
4
3.3.6.
Assembling the Top Layer of the Radome
.........................................................................................................
3
‐
5
3.3.7.
Assembling the Third Layer of the Radome
.....................................................................................................
3
‐
6
3.3.8.
Assembling the Fourth Layer of the Radome
..................................................................................................
3
‐
7
3.4.
A
SSEMBLING THE
P
EDESTAL
......................................................................................................................... 3‐8
3.5.
A
SSEMBLING THE
R
EFLECTOR
.................................................................................................................... 3‐12
3.6.
I
NSTALLING THE
R
EFLECTOR
...................................................................................................................... 3‐14
3.7.
C
LOSING THE
R
ADOME
.............................................................................................................................. 3‐17
3.8.
C
ONNECTIONS
I
NTO
T
HE
ODU
.................................................................................................................. 3‐18
3.9.
I
NSTALLING
M
AINTENANCE
M
ODE
S
WITCH
& D
OOR
S
ENSOR
...................................................................... 3‐18
3.10.
P
EDESTAL
I
NTERIOR
C
ONNECTIONS
........................................................................................................... 3‐18
3.11.
I
NSTALLING
I
NTERIOR
L
IGHTING
................................................................................................................ 3‐19
3.12.
R
EMOVE THE
S
ERVICE
B
RACKETS
............................................................................................................... 3‐19
3.13.
F
INAL
C
HECKS
........................................................................................................................................... 3‐20
4.
SETUP & TESTING
............................................................................................................................ 4-1
5.
MAINTENANCE
.................................................................................................................................. 5-1
5.1.
S
AFETY
................................................................................................................................................... 5‐1
5.2.
W
ARRANTY
I
NFORMATION
.................................................................................................................................. 5‐1
5.3.
T
ORQUE AND
L
OCTITE
S
PECIFICATIONS
............................................................................................................... 5‐2
5.4. B
ALANCING THE
A
NTENNA
........................................................................................................................... 5‐2
6.
STOWING THE ANTENNA
................................................................................................................ 6-1
6.1.
I
NSTALLING THE
S
ERVICE
B
RACKETS
............................................................................................................ 6‐1
6.2.
R
EMOVE THE
S
ERVICE
B
RACKETS
................................................................................................................. 6‐1
7.
TRACKER 6000 TECHNICAL SPECIFICATIONS
........................................................................... 7-1
7.1.
O
UT
D
OOR
U
NIT
(ODU)
............................................................................................................................. 7‐1
ix
EAR Controlled - ECCN EAR99
Содержание Sea Tel Tracker 6000
Страница 8: ...SeaTelTracker6000 This Page Intentionally Left Blank viii EAR Controlled ECCN EAR99...
Страница 12: ...SeaTelTracker6000 Safety This Page Intentionally Left Blank 1 2 EAR Controlled ECCN EAR99...
Страница 16: ...SeaTelTracker6000 Site Survey Land Based This Page Intentionally Left Blank 2 4 EAR Controlled ECCN EAR99...
Страница 38: ...SeaTelTracker6000 Setup Testing This Page Intentionally Left Blank 4 2 EAR Controlled ECCN EAR99...
Страница 42: ...SeaTelTracker6000 Maintenance This Page Intentionally Left Blank 5 4 EAR Controlled ECCN EAR99...