Installation
Sea Tel Tracker 6000
3‐9
EAR Controlled - ECCN EAR99
10. Refer to drawing 97-167134_A
Assy Drawing, BRACKET KIT,
SERVICE, T6000 to install the
locking brackets
11.
Remove the shipping hardware that mounts the mount the C-Band BUC boxes to
the pallet of the crate. Discard this hardware.
12.
Open each box and remove the C-Band BUC.
13.
Install the C-Band BUCs on each side as shown above.
14.
Connect the cables and waveguide on each side.
15. Install one grounding strap from
the equipment frame to the BUC
(on BOTH sides).
16. Connect the grounding strap to the
BUC (on BOTH sides).
17. Remove the shipping hardware that mounts the mount the Left & Right counter
weights to the pallet of the crate. Discard this hardware.
Содержание Sea Tel Tracker 6000
Страница 8: ...SeaTelTracker6000 This Page Intentionally Left Blank viii EAR Controlled ECCN EAR99...
Страница 12: ...SeaTelTracker6000 Safety This Page Intentionally Left Blank 1 2 EAR Controlled ECCN EAR99...
Страница 16: ...SeaTelTracker6000 Site Survey Land Based This Page Intentionally Left Blank 2 4 EAR Controlled ECCN EAR99...
Страница 38: ...SeaTelTracker6000 Setup Testing This Page Intentionally Left Blank 4 2 EAR Controlled ECCN EAR99...
Страница 42: ...SeaTelTracker6000 Maintenance This Page Intentionally Left Blank 5 4 EAR Controlled ECCN EAR99...