Sea Tel Tracker 6000
Installation
3‐10
EAR Controlled - ECCN EAR99
Refer to drawing 97‐172014 ASSY DRAWING, BALANCE WEIGHT KIT, T6000 for the following steps
(18‐23).
18.
Mount the large GREY counter weights on the lower Ends of the Equipment Frame
as shown above.
19.
Apply Loctite to threads of the mounting bolts. Install the bolts & washers and
tighten to torque spec.
20.
Mount the left side BLUE counter weight (ICU side).
21.
Apply Loctite to threads of the mounting bolts. Install the bolts & washers and
tighten to torque spec.
22.
Mount the right side BLUE counter weight (EL Motor side).
23.
Apply Loctite to threads of the mounting bolts. Install the bolts & washers and
tighten to torque spec.
24.
Install lifting spreader bracket (use
assembly drawing 97-167134)
25.
Thread lifting straps down through
the center of the equipment frame,
through the eyes in the spreader
bracket, to the lifting eyes installed
in the top of the upper post
section.
Equipment frame
Lifting eyes (4 each)
Upper post
Содержание Sea Tel Tracker 6000
Страница 8: ...SeaTelTracker6000 This Page Intentionally Left Blank viii EAR Controlled ECCN EAR99...
Страница 12: ...SeaTelTracker6000 Safety This Page Intentionally Left Blank 1 2 EAR Controlled ECCN EAR99...
Страница 16: ...SeaTelTracker6000 Site Survey Land Based This Page Intentionally Left Blank 2 4 EAR Controlled ECCN EAR99...
Страница 38: ...SeaTelTracker6000 Setup Testing This Page Intentionally Left Blank 4 2 EAR Controlled ECCN EAR99...
Страница 42: ...SeaTelTracker6000 Maintenance This Page Intentionally Left Blank 5 4 EAR Controlled ECCN EAR99...