Installation
Sea Tel Tracker 6000
4. Install at least 2 additional long straps on 2 of the eye nuts to be used as tag lines.
This will help to control the reflector in case of wind while hoisting.
5. Using a suitably rated derrick or crane, lift the Antenna Assembly (approx. weight
870lbs) up over the radome base section and suspend just above the Equipment
Frame assembly.
3‐15
EAR Controlled - ECCN EAR99
Содержание Sea Tel Tracker 6000
Страница 8: ...SeaTelTracker6000 This Page Intentionally Left Blank viii EAR Controlled ECCN EAR99...
Страница 12: ...SeaTelTracker6000 Safety This Page Intentionally Left Blank 1 2 EAR Controlled ECCN EAR99...
Страница 16: ...SeaTelTracker6000 Site Survey Land Based This Page Intentionally Left Blank 2 4 EAR Controlled ECCN EAR99...
Страница 38: ...SeaTelTracker6000 Setup Testing This Page Intentionally Left Blank 4 2 EAR Controlled ECCN EAR99...
Страница 42: ...SeaTelTracker6000 Maintenance This Page Intentionally Left Blank 5 4 EAR Controlled ECCN EAR99...